You are currently viewing PEC license Limits in Pakistan
Exploring the Pakistan Engineering Council

PEC license Limits in Pakistan

PEC license Limits in Pakistan

Introduction:

The Pakistan Engineering Council (PEC) is the regulatory authority responsible for categorizing and registering engineering firms in Pakistan. Each PEC license category defines the upper project cost limit that a registered firm is allowed to undertake. These categories range from C-6, which is the lowest, to C-A, which has no project cost limit. In this article, we will delve into the specifics of each category, including project cost limits, minimum Professional Credit Points (PCP) requirements, and the need for SECP registration where applicable.

1. PEC C6 License Limit:

– Project Limit: PKR 25 Million
– Engineers Required: Minimum 5 PCPs
– SECP Registration: Not required
– Description: C6 category firms are limited to executing projects with a cost of up to PKR 25 million. These firms are often involved in maintenance works and are the starting point for government contractors.

2. PEC C5 License Limit:

– Project Limit: PKR 65 Million
– Engineers Required: Minimum 1 engineer
– Balance Required: PKR 3 Million
– SECP Registration: Not required
– Description: C5 firms can undertake projects with a cost of up to PKR 65 million. They require a closing balance of PKR 3 million and only one engineer with 5 PCP points.

3. PEC C4 License Limit:

– Project Limit: PKR 200 Million
– Engineers Required: Minimum 3 engineers or 15 PCPs
– Balance Required: PKR 6 Million
– SECP Registration: Not required
– Description: C4 firms are eligible for projects not exceeding PKR 200 million. They need a closing balance of PKR 6 million and either three engineers or 15 PCP points for registration.

4. PEC C3 License Limit:

– Project Limit: PKR 500 Million
– Engineers Required: Minimum 4 engineers or 20 PCPs
– Balance Required: PKR 30 Million
– SECP Registration: Required
– Description: C3 category firms can undertake public works up to PKR 500 million. They require 20 PCP points or four engineers and must be SECP registered.

5. PEC C2 License Limit:

– Project Limit: PKR 1,000 Million
– Engineers Required: Minimum 4 engineers or 35 PCPs
– Balance Required: PKR 50 Million
– SECP Registration: Required
– Description: C2 firms are capable of executing projects with a cost of up to PKR 1,000 million. They need 35 PCP points or four engineers and must be SECP registered.

6. PEC C1 License Limit:

– Project Limit: PKR 2,500 Million
– Engineers Required: Minimum 90 PCPs
– Balance Required: PKR 80 Million
– SECP Registration: Required
– Description: C1 firms have the capacity to undertake substantial projects with a limit of PKR 2,500 million. They require a significant 90 PCP points and must be SECP registered. Additionally, firms must have a minimum of three years of market experience for C1 registration.

7. PEC C-B License Limit:

– Project Limit: PKR 4,000 Million
– Engineers Required: Minimum 120 PCPs
– Balance Required: PKR 100 Million
– SECP Registration: Required
– Description: C-B firms are equipped to handle significant projects with a limit of PKR 4,000 million. They require a substantial 120 PCP points and must be SECP registered.

8. PEC C-A License Limit (PEC No Limit Firm):

– Project Limit: No Limit
– Engineers Required: Minimum 200 PCPs
– Balance Required: PKR 150 Million
– SECP Registration: Required
– Description: C-A firms have no project cost limit, making them suitable for large-scale projects. They necessitate a minimum of 200 PCP points and must be SECP registered.

In Conclusion:

Understanding the PEC license categories and their associated limits is crucial for engineering firms in Pakistan. These categories determine the scale of projects a firm can undertake and the requirements for registration. Meeting the PCP points and SECP registration, where applicable, is essential for firms looking to grow and operate within the engineering sector in Pakistan.